A lot has happened on the house over the last couple of days. I didn’t post yesterday, just too darn busy. But now we have our lender set up after shopping for a while, so hopefully we are good to go there! We are within the 60 day lock period and have gotten locked for our rate as well. So now that we have locked in our rates, everyone else can breath easy that the rates will probably drop. 😉
So I will start with the outside of our house.
The siding is nearly finished. In fact, it might be done today.
They poured the patio in the back. It is supposed to be 12×12 but that looks so small to me. I am going to measure it tonight. To me the squares look 4X4 instead of 6X6. Anyway, I didn’t stand on it because it was wet. I will get a better look today. I think we have 3 ft wide doors (but then I’m really bad at this…) but if the door is 3ft wide, I don’t see how that square of concrete is 6 feet wide. Just sayin’. I know Bruce is telling me otherwise, but I did in Missouri for a little while and developed that ‘show me state’ attitude. 🙂
Now inside the house.
Photo: Kitchen to Sunroom
The inside is all not only has all the sheet-rock up, but is now also has the mud and taping done. At least the first round. Boy is it messy in there right now.
Photo: Living Room Fireplace
Photo: Dining room into Kitchen Pantry.