House – Aug. 14

It’s getting there.

IMG_20180814_193806342.jpg

I’m thinking they will most likely finish the siding this week. They are getting it done, but it is a slow process.

IMG_20180814_193938865_HDR.jpg

I did measure the patio just to be sure. 🙂  It’s right. AND I will say it looks bigger when you are actually standing on it.

IMG_20180814_193839632_HDR.jpg

Above is the front door. Nothing else was done in the house when I went yesterday evening. They have things open to let the walls and ceiling dry before they start sanding the walls and prepping for painting.

The patio is the only concrete poured so far, there is the front porch, garage floor and sidewalk still to go. We are now within 60 days of closing.

5 thoughts on “House – Aug. 14

Leave a comment