House – July 30th

IMG_20180730_191742757_HDR.jpg

They have the roof on and cleaned up, wrapping the outside is done. Windows in.

IMG_20180730_191703009_HDR.jpg

Below is inside the garage, have the box in and have the inspection board in place…some of the drywall.  Front door and garage access door to the house are leaning in the garage. Not in yet. Floor not yet poured.  Elec. walk through is early tomorrow morning where we can get outlets assigned to where we need them.

IMG_20180730_191840611_HDR.jpg

Getting some of the insulation in.

House 5 7.30.18.jpg

It has suddenly been coming along quickly after a long wait to get going. No doubt it will slow down some once the drywall goes in and the different trades need to get in and ‘do their thing’. We most likely still have about 3 more months, or there bouts, to be able to close and move in.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s