They have the roof on and cleaned up, wrapping the outside is done. Windows in.
Below is inside the garage, have the box in and have the inspection board in place…some of the drywall. Front door and garage access door to the house are leaning in the garage. Not in yet. Floor not yet poured. Elec. walk through is early tomorrow morning where we can get outlets assigned to where we need them.
Getting some of the insulation in.
It has suddenly been coming along quickly after a long wait to get going. No doubt it will slow down some once the drywall goes in and the different trades need to get in and ‘do their thing’. We most likely still have about 3 more months, or there bouts, to be able to close and move in.